380
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal heat treating | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0625 #04 Y:2007 | 04 | 2007 | Turn off equipment when not in use | $5,881 | - | |
| MA0625 #03 Y:2007 | 03 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $7,861 | $14,400 | |
| MA0625 #02 Y:2007 | 02 | 2007 | Size electric motors for peak operating efficiency | $8,935 | $8,000 | |
| MA0625 #01 Y:2007 | 01 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $17,463 | $31,000 | |
| UD0744 #09 Y:2006 | 09 | 2006 | Reduce the pressure of compressed air to the minimum required | $731 | - | |
| UD0744 #08 Y:2006 | 08 | 2006 | Utilize daylight whenever possible in lieu of artificial light | $1,657 | $1,195 | |
| UD0744 #07 Y:2006 | 07 | 2006 | Use heat in flue gases to preheat products or materials | $15,843 | $3,000 | |
| UD0744 #06 Y:2006 | 06 | 2006 | Use optimum thickness insulation | $17,062 | $7,053 | |
| UD0744 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $24,118 | $33,800 | |
| UD0744 #04 Y:2006 | 04 | 2006 | Use optimum thickness insulation | $24,529 | $14,670 | |
| UD0744 #03 Y:2006 | 03 | 2006 | Ventilation system to shut off when room is not in use | $29,099 | $50,000 | |
| UD0744 #02 Y:2006 | 02 | 2006 | Reduce combustion air flow to optimum | $60,139 | $400,400 | |
| UD0744 #01 Y:2006 | 01 | 2006 | Use heat in flue gases to preheat products or materials | $67,027 | $1,500 | |
| OK0723 #09 Y:2005 | 09 | 2005 | Utilize higher efficiency lamps and/or ballasts | $3,836 | $9,913 | |
| OK0723 #08 Y:2005 | 08 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $23,096 | $42,002 | |
| OK0723 #07 Y:2005 | 07 | 2005 | Eliminate or reduce compressed air usage | $8,395 | $7,192 | |
| OK0723 #06 Y:2005 | 06 | 2005 | Reduce the pressure of compressed air to the minimum required | $13,876 | $17,879 | |
| OK0723 #05 Y:2005 | 05 | 2005 | Preheat boiler makeup water with waste process heat | $3,531 | $5,250 | |
| OK0723 #04 Y:2005 | 04 | 2005 | Repair or replace steam traps | $1,065 | $2,539 | |
| OK0723 #03 Y:2005 | 03 | 2005 | Use insulation in furnaces to facilitate heating / cooling | $1,135 | $587 |