ITAC Assessment: OK0723
ITAC logo
ITAC Assessment: OK0723
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Metal Plating
NAICS 332811: Metal Heat Treating
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 70,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,576 6,071,609
kWh
Electricity Demand $77,096 16,966
kW-mo/yr
Electricity Fees $5,303 -
Natural Gas $200,899 32,308
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,238

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1212: Operate boilers on high fire setting $23,600 $18,000 - - $23,600
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $7,849 $10,033 - - $7,849
-
MMBtu
-
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,135 $587 - - $1,135
-
MMBtu
-
04 2.2113: Repair or replace steam traps $1,065 $2,539 - - $1,065
-
MMBtu
-
05 2.2441: Preheat boiler makeup water with waste process heat $3,531 $5,250 - - $3,531
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $13,876 $17,879 $13,876
221,654
kWh
- - -
07 2.4239: Eliminate or reduce compressed air usage $8,395 $7,192 $8,395
149,174
kWh
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,096 $42,002 $23,096
368,945
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,836 $9,913 $3,577
73,008
kWh
$531
-
kW-mo/yr
- $(-272.0)
TOTAL RECOMMENDED $86,383 $113,395 $48,944
812,781
kWh
$531
-
kW-mo/yr
$37,180
-
MMBtu
$(-272.0)
TOTAL IMPLEMENTED $65,238 $83,718 $36,972
590,599
kWh
- $28,266
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs