Assessment Year | 2006 |
---|---|
Principal Product | Thermal Processing / Heat Treating |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 26 |
Plant Area |
55,000
ft2
|
Annual Production | 33,100,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,452 | 2,033,355 |
kWh
|
$0.090 |
Natural Gas | $1,180,849 | 132,583 |
MMBtu
|
$8.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $240,205 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2424: Use heat in flue gases to preheat products or materials | $67,027 | $1,500 | - |
$67,027
-
MMBtu
|
- | |
02 | 2.1113: Reduce combustion air flow to optimum | $60,139 | $400,400 | - |
$60,139
-
MMBtu
|
- | |
03 | 2.7311: Ventilation system to shut off when room is not in use | $29,099 | $50,000 | - |
$29,099
-
MMBtu
|
- | |
04 | 2.2515: Use optimum thickness insulation | $24,529 | $14,670 | - |
$24,529
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,118 | $33,800 |
$23,587
262,080
kWh
|
- | $531 | |
06 | 2.2515: Use optimum thickness insulation | $17,062 | $7,053 | - |
$17,062
-
MMBtu
|
- | |
07 | 2.2424: Use heat in flue gases to preheat products or materials | $15,843 | $3,000 | - |
$15,843
-
MMBtu
|
- | |
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,657 | $1,195 |
$1,657
184,111
kWh
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $731 | - |
$731
8,124
kWh
|
- | - | |
TOTAL RECOMMENDED | $240,205 | $511,618 |
$25,975
454,315
kWh
|
$213,699
-
MMBtu
|
$531 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs