ITAC Assessment: CO0014
ITAC logo
ITAC Assessment: CO0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PROCESSED FEEDS
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area
n/a
Annual Production 39,250
ton
Production Hrs. Annual 2,860
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,268 669,109
kWh
Natural Gas $23,366 8,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,292 $300 - $2,292
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $561 $300 - $561
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $74 $135 - $74
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $730 $2,500 - $730
-
MMBtu
05 2.3191: Use demand controller or load shedder $4,970 $1,000 $4,970
-
kWh
-
TOTAL RECOMMENDED $8,627 $4,235 $4,970
-
kWh
$3,657
-
MMBtu
TOTAL IMPLEMENTED $7,897 $1,735 $4,970
-
kWh
$2,927
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs