Assessment Year | 2023 |
---|---|
Principal Product | Power Generators |
NAICS | 335312: Motor and Generator Manufacturing |
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
90,000
ft2
|
Annual Production | 600
units
|
Production Hrs. Annual | 2,100
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,808 | 1,206,000 |
kWh
|
$0.036 |
Electricity Demand | $66,169 | 4,048 |
kW-mo/yr
|
$16.35 |
Electricity Fees | $9,746 | - |
|
- |
Natural Gas | $69,339 | 6,871 |
MMBtu
|
$10.09 |
TOTAL YEARLY COSTS | $189,063 | |||
RECOMMENDED SAVINGS* | $29,892 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $8,860 | $4,445 | - | - | $8,860 | - | - | |
02 | 2.3192: Use fossil fuel powered generator during peak demand periods | $7,404 | $5,700 |
$3,089
85,800
kWh
|
$4,315
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,223 | $53,198 |
$2,414
67,056
kWh
|
$2,809
-
kW-mo/yr
|
- | - | - | |
04 | 4.811: Demolish old building to reduce tax and insurance bills | $3,088 | $3,300 | - | - | - | - | $3,088 | |
05 | 2.9114: Use solar heat to make electricty | $2,944 | $78,979 |
$2,699
74,971
kWh
|
$245
-
kW-mo/yr
|
- | - | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,861 | $721 |
$187
5,194
kWh
|
- | - |
$1,674
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $512 | $161 |
$315
8,760
kWh
|
$196
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $29,892 | $146,504 |
$8,704
241,781
kWh
|
$7,566
-
kW-mo/yr
|
$8,860 |
$1,674
-
MMBtu
|
$3,088 | ||
TOTAL IMPLEMENTED | $15,000 | $59,780 |
$6,005
166,810
kWh
|
$7,320
-
kW-mo/yr
|
- |
$1,674
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs