2,044
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UM0372 #01 Y:2010 | 01 | 2010 | Install occupancy sensors | $2,083 | $2,500 | |
| MA0665 #07 Y:2010 | 07 | 2010 | Reduce illumination to minimum necessary levels | $155 | $180 | |
| MA0665 #06 Y:2010 | 06 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,028 | $480 | |
| MA0665 #05 Y:2010 | 05 | 2010 | Install occupancy sensors | $1,134 | $3,150 | |
| MA0665 #04 Y:2010 | 04 | 2010 | Turn off equipment during breaks, reduce operating time | $1,470 | $200 | |
| MA0665 #03 Y:2010 | 03 | 2010 | Replace electrically-operated equipment with fossil fuel equipment | $1,625 | $2,000 | |
| MA0665 #02 Y:2010 | 02 | 2010 | Install compressor air intakes in coolest locations | $3,642 | $18,330 | |
| MA0665 #01 Y:2010 | 01 | 2010 | Upgrade controls on compressors | $15,680 | $58,600 | |
| MA0663 #05 Y:2010 | 05 | 2010 | Reduce the pressure of compressed air to the minimum required | $900 | $200 | |
| MA0663 #04 Y:2010 | 04 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $938 | $600 | |
| MA0663 #03 Y:2010 | 03 | 2010 | Use cooling tower or economizer to replace chiller cooling | $4,990 | $21,410 | |
| MA0663 #02 Y:2010 | 02 | 2010 | Replace existing chiller with high efficiency model | $10,239 | $24,000 | |
| MA0663 #01 Y:2010 | 01 | 2010 | Use waste heat from hot flue gases to preheat | $22,896 | $90,000 | |
| WV0406 #06 Y:2010 | 06 | 2010 | Install compressor air intakes in coolest locations | $3,089 | $245 | |
| WV0406 #05 Y:2010 | 05 | 2010 | Eliminate or reduce compressed air usage | $3,767 | $65 | |
| WV0406 #04 Y:2010 | 04 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $15,356 | $7,809 | |
| WV0406 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $17,098 | $49,200 | |
| WV0406 #02 Y:2010 | 02 | 2010 | Use waste heat from hot flue gases to preheat | $75,243 | $91,000 | |
| WV0406 #01 Y:2010 | 01 | 2010 | Replace existing equipment with more suitable substitutes | $165,791 | $87,000 | |
| LL0328 #06 Y:2010 | 06 | 2010 | Conserve energy by efficient use of vending machines | $403 | $471 |