2,058
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UA3004 #06 Y:2010 | 06 | 2010 | Insulate bare equipment | $83 | $400 | |
| UA3004 #05 Y:2010 | 05 | 2010 | Insulate bare equipment | $104 | $240 | |
| UA3004 #04 Y:2010 | 04 | 2010 | Use waste heat from hot flue gases to preheat | $2,339 | $3,355 | |
| UA3004 #03 Y:2010 | 03 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $655 | $1,000 | |
| UA3004 #02 Y:2010 | 02 | 2010 | Use photocell controls | $626 | $225 | |
| UA3004 #01 Y:2010 | 01 | 2010 | Utilize higher efficiency lamps and/or ballasts | $6,609 | $24,042 | |
| UM0372 #09 Y:2010 | 09 | 2010 | Cover open tanks | $9,602 | $2,472 | |
| UM0372 #08 Y:2010 | 08 | 2010 | Cover open tanks | $10,159 | $500 | |
| UM0372 #07 Y:2010 | 07 | 2010 | Cover open tanks | $17,216 | $7,182 | |
| UM0372 #06 Y:2010 | 06 | 2010 | Eliminate or reduce compressed air usage | $2,702 | $3,500 | |
| UM0372 #05 Y:2010 | 05 | 2010 | Recover waste heat from equipment | $88 | $1,000 | |
| UM0372 #04 Y:2010 | 04 | 2010 | Reduce the pressure of compressed air to the minimum required | $645 | $200 | |
| UM0372 #03 Y:2010 | 03 | 2010 | Install compressor air intakes in coolest locations | $265 | $2,000 | |
| UM0372 #02 Y:2010 | 02 | 2010 | Utilize higher efficiency lamps and/or ballasts | $3,092 | $25,000 | |
| UM0372 #01 Y:2010 | 01 | 2010 | Install occupancy sensors | $2,083 | $2,500 | |
| MA0665 #07 Y:2010 | 07 | 2010 | Reduce illumination to minimum necessary levels | $155 | $180 | |
| MA0665 #06 Y:2010 | 06 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,028 | $480 | |
| MA0665 #05 Y:2010 | 05 | 2010 | Install occupancy sensors | $1,134 | $3,150 | |
| MA0665 #04 Y:2010 | 04 | 2010 | Turn off equipment during breaks, reduce operating time | $1,470 | $200 | |
| MA0665 #03 Y:2010 | 03 | 2010 | Replace electrically-operated equipment with fossil fuel equipment | $1,625 | $2,000 |