| Assessment Year | 2010 |
|---|---|
| Principal Product | Painting/Coating |
| NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
45,000
ft2
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,697 | 660,920 |
kWh
|
$0.10 |
| Electricity Demand | $23,420 | 4,941 |
kW-mo/yr
|
$4.74 |
| Natural Gas | $74,169 | 4,941 |
MMBtu
|
$15.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,416 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,281 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,609 | $24,042 |
$5,509
53,787
kWh
|
$1,100
-
kW-mo/yr
|
- | |
| 02 | 2.7134: Use photocell controls | $626 | $225 |
$626
6,107
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $655 | $1,000 |
$553
5,397
kWh
|
$102
-
kW-mo/yr
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,339 | $3,355 | - | - |
$2,339
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $104 | $240 | - | - |
$104
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $83 | $400 | - | - |
$83
-
MMBtu
|
|
| TOTAL RECOMMENDED | $10,416 | $29,262 |
$6,688
65,291
kWh
|
$1,202
-
kW-mo/yr
|
$2,526
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,281 | $1,225 |
$1,179
11,504
kWh
|
$102
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs