Assessment Year | 2010 |
---|---|
Principal Product | Painting/Coating |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
45,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,697 | 660,920 |
kWh
|
$0.10 |
Electricity Demand | $23,420 | 4,941 |
kW-mo/yr
|
$4.74 |
Natural Gas | $74,169 | 4,941 |
MMBtu
|
$15.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,416 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,281 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,609 | $24,042 |
$5,509
53,787
kWh
|
$1,100
-
kW-mo/yr
|
- | |
02 | 2.7134: Use photocell controls | $626 | $225 |
$626
6,107
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $655 | $1,000 |
$553
5,397
kWh
|
$102
-
kW-mo/yr
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,339 | $3,355 | - | - |
$2,339
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $104 | $240 | - | - |
$104
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $83 | $400 | - | - |
$83
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,416 | $29,262 |
$6,688
65,291
kWh
|
$1,202
-
kW-mo/yr
|
$2,526
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,281 | $1,225 |
$1,179
11,504
kWh
|
$102
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs