ITAC Assessment: UM0372
ITAC logo
ITAC Assessment: UM0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Wide Range of Commercial Heat Treating Services
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 30,200
ft2
Annual Production 3,150,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,679 2,042,317
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $2,083 $2,500 $2,083
28,062
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,092 $25,000 $2,457
33,097
kWh
$635
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $265 $2,000 $213
2,865
kWh
$52
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $645 $200 $525
7,075
kWh
$120
-
kW-mo/yr
05 2.2437: Recover waste heat from equipment $88 $1,000 $72
969
kWh
$16
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $2,702 $3,500 $2,702
36,400
kWh
-
07 2.2514: Cover open tanks $17,216 $7,182 $17,216
231,934
kWh
-
08 2.2514: Cover open tanks $10,159 $500 $8,245
111,072
kWh
$1,914
-
kW-mo/yr
09 2.2514: Cover open tanks $9,602 $2,472 $9,602
129,355
kWh
-
TOTAL RECOMMENDED $45,852 $44,354 $43,115
580,829
kWh
$2,737
-
kW-mo/yr
TOTAL IMPLEMENTED $45,852 $44,354 $43,115
580,829
kWh
$2,737
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs