Assessment Year | 2010 |
---|---|
Principal Product | Wide Range of Commercial Heat Treating Services |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 21 |
Plant Area |
30,200
ft2
|
Annual Production | 3,150,000
pieces
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,679 | 2,042,317 |
kWh
|
$0.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,852 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $2,083 | $2,500 |
$2,083
28,062
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,092 | $25,000 |
$2,457
33,097
kWh
|
$635
-
kW-mo/yr
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $265 | $2,000 |
$213
2,865
kWh
|
$52
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $645 | $200 |
$525
7,075
kWh
|
$120
-
kW-mo/yr
|
|
05 | 2.2437: Recover waste heat from equipment | $88 | $1,000 |
$72
969
kWh
|
$16
-
kW-mo/yr
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $2,702 | $3,500 |
$2,702
36,400
kWh
|
- | |
07 | 2.2514: Cover open tanks | $17,216 | $7,182 |
$17,216
231,934
kWh
|
- | |
08 | 2.2514: Cover open tanks | $10,159 | $500 |
$8,245
111,072
kWh
|
$1,914
-
kW-mo/yr
|
|
09 | 2.2514: Cover open tanks | $9,602 | $2,472 |
$9,602
129,355
kWh
|
- | |
TOTAL RECOMMENDED | $45,852 | $44,354 |
$43,115
580,829
kWh
|
$2,737
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $45,852 | $44,354 |
$43,115
580,829
kWh
|
$2,737
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs