Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,992

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0327 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,732 $1,026
IC0327 #04 Y:2025 Insulate bare equipment $1,870 $5,460
IC0327 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $3,276 -
IC0327 #02 Y:2025 Adjust burners for efficient operation $11,584 $631
IC0327 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,206 $226
SD0676 #11 Y:2025 Install common header on compressors $2,478 $2,050
SD0676 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,179 $8,868
SD0676 #09 Y:2025 Utilize a less expensive cooling method $153,587 $200,000
SD0676 #08 Y:2025 Reschedule plant operations or reduce load to avoid peaks $143,491 -
SD0676 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,684 $2,699
SD0676 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,821 $7,047
SD0676 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,805 -
SD0676 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $39,510 $44,993
SD0676 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,618 $1,911
SD0676 #02 Y:2025 Use battery storage for demand control $109,396 $5,254
SD0676 #01 Y:2025 Use solar heat to make electricty $35,908 $47,771
SJ0035 #09 Y:2025 Combine utility meters $38,439 -
SJ0035 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $695 $3,014
SJ0035 #07 Y:2025 Adopt in-house material generation $33,751 $121,250
SJ0035 #06 Y:2025 Use battery storage for demand control $75,310 $186,900