Assessment Year | 2025 |
---|---|
Principal Product | heat treated and brazed metal parts |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $50 M to 100M |
# of Employees | 26 |
Plant Area |
18,000
ft2
|
Annual Production | 8,000
units
|
Production Hrs. Annual | 5,559
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $507,617 | 2,006,070 |
kWh
|
$0.25 |
Electricity Demand | $273,705 | 8,459 |
kW-mo/yr
|
$32.36 |
Natural Gas | $168,555 | 8,067 |
MMBtu
|
$20.89 |
TOTAL YEARLY COSTS | $949,877 | |||
RECOMMENDED SAVINGS* | $381,737 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $54,597 | $224,515 |
$46,350
180,739
kWh
|
$8,247
-
kW-mo/yr
|
- | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $15,438 | $13,895 | - | - | - |
$15,438
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $98,897 | $43,475 |
$89,915
355,390
kWh
|
$8,982
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,621 | - |
$3,039
12,012
kWh
|
$582
-
kW-mo/yr
|
- | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $13,285 | - |
$13,285
52,511
kWh
|
- | - | - | - | |
06 | 2.3141: Use battery storage for demand control | $106,498 | $186,900 | - |
$85,793
-
kW-mo/yr
|
$20,705 | - | - | |
07 | 4.212: Adopt in-house material generation | $33,751 | $121,250 |
$(-26,622.0)
(-105,226)
kWh
|
$(-6,569.0)
-
kW-mo/yr
|
- | - | $66,942 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $695 | $3,014 |
$549
2,170
kWh
|
$146
-
kW-mo/yr
|
- | - | - | |
09 | 2.8112: Combine utility meters | $54,955 | - | - | - | $54,955 | - | - | |
TOTAL RECOMMENDED | $381,737 | $593,049 |
$126,516
497,596
kWh
|
$97,181
-
kW-mo/yr
|
$75,660 |
$15,438
-
MMBtu
|
$66,942 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs