ITAC Assessment: SJ0035
ITAC logo
ITAC Assessment: SJ0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product heat treated and brazed metal parts
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $50
M
to 100
M
# of Employees 26
Plant Area 18,000
ft2
Annual Production 8,000
units
Production Hrs. Annual 5,559
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $507,617 2,006,070
kWh
Electricity Demand $273,705 8,459
kW-mo/yr
Natural Gas $168,555 8,067
MMBtu
TOTAL YEARLY COSTS $949,877
RECOMMENDED SAVINGS* $381,737 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $54,597 $224,515 $46,350
180,739
kWh
$8,247
-
kW-mo/yr
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $15,438 $13,895 - - - $15,438
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $98,897 $43,475 $89,915
355,390
kWh
$8,982
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,621 - $3,039
12,012
kWh
$582
-
kW-mo/yr
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $13,285 - $13,285
52,511
kWh
- - - -
06 2.3141: Use battery storage for demand control $106,498 $186,900 - $85,793
-
kW-mo/yr
$20,705 - -
07 4.212: Adopt in-house material generation $33,751 $121,250 $(-26,622.0)
(-105,226)
kWh
$(-6,569.0)
-
kW-mo/yr
- - $66,942
08 2.7142: Utilize higher efficiency lamps and/or ballasts $695 $3,014 $549
2,170
kWh
$146
-
kW-mo/yr
- - -
09 2.8112: Combine utility meters $54,955 - - - $54,955 - -
TOTAL RECOMMENDED $381,737 $593,049 $126,516
497,596
kWh
$97,181
-
kW-mo/yr
$75,660 $15,438
-
MMBtu
$66,942
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs