Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,971

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0588 #05 Y:2005 Reduce the pressure of compressed air to the minimum required $812 $2,599
MA0588 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,132 $4,668
MA0588 #03 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $1,994 $1,242
MA0588 #02 Y:2005 Use minimum steam operating pressure $2,294 $500
MA0588 #01 Y:2005 Insulate bare equipment $3,404 $2,197
WV0326 #12 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $295 $180
WV0326 #11 Y:2005 Reduce the pressure of compressed air to the minimum required $388 $140
WV0326 #10 Y:2005 Develop a repair/replace policy $459 $54
WV0326 #09 Y:2005 Use synthetic lubricant $577 $17
WV0326 #08 Y:2005 Utilize a less expensive cooling method $652 $367
WV0326 #07 Y:2005 Use waste heat from flue gases to heat space conditioning air $780 $1,076
WV0326 #06 Y:2005 Reduce the pressure of compressed air to the minimum required $1,047 $3,517
WV0326 #05 Y:2005 Analyze flue gas for proper air/fuel ratio $2,818 $1,000
WV0326 #04 Y:2005 Use waste heat from hot flue gases to preheat $4,621 $2,722
WV0326 #03 Y:2005 Eliminate or reduce compressed air usage $5,386 $1,840
WV0326 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $5,897 $14,339
WV0326 #01 Y:2005 Insulate bare equipment $6,011 $1,797
MA0586 #07 Y:2005 Install occupancy sensors $443 $1,395
MA0586 #06 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $841 $1,646
MA0586 #05 Y:2005 Combine utility meters $1,736 $1,950