Assessment Year | 2005 |
---|---|
Principal Product | Heat Treated Metal |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 10 |
Plant Area |
28,800
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $203,176 | 2,458,320 |
kWh
|
$0.083 |
Electricity Demand | $61,287 | 8,242 |
kW-mo/yr
|
$7.44 |
Natural Gas | $49,266 | 3,240 |
MMBtu
|
$15.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,538 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,029 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $22,510 | $54,165 |
$6,369
293,808
kWh
|
$16,141
-
kW-mo/yr
|
- | - | |
02 | 2.2511: Insulate bare equipment | $43,329 | $868 |
$35,392
610,210
kWh
|
$7,937
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $9,278 | $12,817 |
$6,622
114,167
kWh
|
$2,656
-
kW-mo/yr
|
- | - | |
04 | 4.424: Improve space comfort conditioning | $6,479 | $13,400 |
$629
10,843
kWh
|
- | - | $5,850 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,506 | $4,360 |
$6,226
107,348
kWh
|
$1,280
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,005 | $1,355 |
$171
14,377
kWh
|
$834
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,895 | $1,653 |
$1,895
22,072
kWh
|
- | - | - | |
08 | 2.7145: Install skylights | $1,181 | $9,627 |
$1,181
14,227
kWh
|
- | - | - | |
09 | 2.2437: Recover waste heat from equipment | $2,339 | $24,500 | - | - |
$2,339
-
MMBtu
|
- | |
10 | 2.7141: Lower light fixtures in high ceiling areas | $3,016 | - |
$2,502
43,131
kWh
|
$514
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $98,538 | $122,745 |
$60,987
1,230,183
kWh
|
$29,362
-
kW-mo/yr
|
$2,339
-
MMBtu
|
$5,850 | ||
TOTAL IMPLEMENTED | $66,029 | $21,053 |
$52,808
911,305
kWh
|
$13,221
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs