ITAC Assessment: UF0374
ITAC logo
ITAC Assessment: UF0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Heat Treated Metal
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 28,800
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,176 2,458,320
kWh
Electricity Demand $61,287 8,242
kW-mo/yr
Natural Gas $49,266 3,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,029

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $22,510 $54,165 $6,369
293,808
kWh
$16,141
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $43,329 $868 $35,392
610,210
kWh
$7,937
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $9,278 $12,817 $6,622
114,167
kWh
$2,656
-
kW-mo/yr
- -
04 4.424: Improve space comfort conditioning $6,479 $13,400 $629
10,843
kWh
- - $5,850
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,506 $4,360 $6,226
107,348
kWh
$1,280
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,005 $1,355 $171
14,377
kWh
$834
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,895 $1,653 $1,895
22,072
kWh
- - -
08 2.7145: Install skylights $1,181 $9,627 $1,181
14,227
kWh
- - -
09 2.2437: Recover waste heat from equipment $2,339 $24,500 - - $2,339
-
MMBtu
-
10 2.7141: Lower light fixtures in high ceiling areas $3,016 - $2,502
43,131
kWh
$514
-
kW-mo/yr
- -
TOTAL RECOMMENDED $98,538 $122,745 $60,987
1,230,183
kWh
$29,362
-
kW-mo/yr
$2,339
-
MMBtu
$5,850
TOTAL IMPLEMENTED $66,029 $21,053 $52,808
911,305
kWh
$13,221
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs