2,030
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UC2510 #01 Y:2025 | 01 | 2025 | Pay utility bills on time | $984 | - |
n/a
|
| TT0336 #12 Y:2025 | 12 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $153 | $255 |
n/a
|
| TT0336 #11 Y:2025 | 11 | 2025 | Install occupancy sensors | $355 | $1,600 |
n/a
|
| TT0336 #10 Y:2025 | 10 | 2025 | Utilize controls to operate equipment only when needed | $507 | $100 |
n/a
|
| TT0336 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $551 | $375 |
n/a
|
| TT0336 #08 Y:2025 | 08 | 2025 | Reduce the pressure of compressed air to the minimum required | $572 | $60 |
n/a
|
| TT0336 #07 Y:2025 | 07 | 2025 | Eliminate or reduce compressed air usage | $1,078 | $400 |
n/a
|
| TT0336 #06 Y:2025 | 06 | 2025 | Utilize controls to operate equipment only when needed | $1,830 | $500 |
n/a
|
| TT0336 #05 Y:2025 | 05 | 2025 | Optimize plant power factor | $2,201 | $5,250 |
n/a
|
| TT0336 #04 Y:2025 | 04 | 2025 | Burn a less expensive grade of fuel | $6,724 | $40,000 |
n/a
|
| TT0336 #03 Y:2025 | 03 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $13,640 | $6,680 |
n/a
|
| TT0336 #02 Y:2025 | 02 | 2025 | Use battery storage for demand control | $19,703 | $159,000 |
n/a
|
| TT0336 #01 Y:2025 | 01 | 2025 | Minimize non-essential material in heat treatment process | $21,145 | $30,000 |
n/a
|
| IP0213 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $7,498 | $13,433 | |
| IP0213 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $23,151 | $26,250 | |
| IP0213 #08 Y:2025 | 08 | 2025 | Use heat from boiler blowdown to preheat boiler feed water | $48,428 | $56,200 | |
| IP0213 #07 Y:2025 | 07 | 2025 | Reduce space conditioning during non-working hours | $825 | $340 | |
| IP0213 #06 Y:2025 | 06 | 2025 | Replace hydraulic / pneumatic equipment with electric equipment | $9,346 | $3,710 | |
| IP0213 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $953 | $280 | |
| IP0213 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $40,943 | $4,528 |