1,971
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0317 #13 Y:2024 | 13 | 2024 | Insulate bare equipment | $2,154 | $4,516 | |
| IC0317 #12 Y:2024 | 12 | 2024 | Install smaller boiler (increase high fire duty cycle) | $11,344 | $21,200 | |
| IC0317 #11 Y:2024 | 11 | 2024 | Install occupancy sensors | $151 | $425 | |
| IC0317 #10 Y:2024 | 10 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $397 | $597 | |
| IC0317 #09 Y:2024 | 09 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $972 | $2,234 | |
| IC0317 #08 Y:2024 | 08 | 2024 | Use radiant heater for spot heating | $15,053 | $20,087 | |
| IC0317 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $32,668 | $258,530 | |
| IC0317 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $704 | - | |
| IC0317 #05 Y:2024 | 05 | 2024 | Eliminate or reduce compressed air usage | $2,337 | $108 | |
| IC0317 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $431 | $1,113 | |
| IC0317 #03 Y:2024 | 03 | 2024 | Recharge batteries on during off-peak demand periods | $930 | - | |
| IC0317 #02 Y:2024 | 02 | 2024 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $10,127 | $7,240 | |
| IC0317 #01 Y:2024 | 01 | 2024 | Install efficient rectifiers | $6,191 | $19,124 | |
| SJ0028 #05 Y:2024 | 05 | 2024 | Lower temperature during the winter season and vice-versa | $2,098 | - | |
| SJ0028 #04 Y:2024 | 04 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $69 | $62 | |
| SJ0028 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,344 | $2,064 | |
| SJ0028 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $6,130 | - | |
| SJ0028 #01 Y:2024 | 01 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $2,778 | $9,383 | |
| NL0102 #07 Y:2024 | 07 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $882 | $802 | |
| NL0102 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,130 | $1,000 |