Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,939

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0382 #04 Y:2025 Replace heat treating oven with more efficient unit $149,231 $825,000
MZ0382 #03 Y:2025 Install occupancy sensors $179 $1,000
MZ0382 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,303 $4,500
MZ0382 #01 Y:2025 Reduce space conditioning during non-working hours $595 $100
UC2510 #06 Y:2025 Use / purchase optimum sized compressor $8,976 $24,000
UC2510 #05 Y:2025 Utilize controls to operate equipment only when needed $7,585 $50
UC2510 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $273 $113
UC2510 #03 Y:2025 Install compressor air intakes in coolest locations $4,144 $1,950
UC2510 #02 Y:2025 Use solar heat to make electricty $26,200 $343,027
UC2510 #01 Y:2025 Pay utility bills on time $984 -
TT0336 #12 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $153 $255
TT0336 #11 Y:2025 Install occupancy sensors $355 $1,600
TT0336 #10 Y:2025 Utilize controls to operate equipment only when needed $507 $100
TT0336 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $551 $375
TT0336 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $572 $60
TT0336 #07 Y:2025 Eliminate or reduce compressed air usage $1,078 $400
TT0336 #06 Y:2025 Utilize controls to operate equipment only when needed $1,830 $500
TT0336 #05 Y:2025 Optimize plant power factor $2,201 $5,250
TT0336 #04 Y:2025 Burn a less expensive grade of fuel $6,724 $40,000
TT0336 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $13,640 $6,680