| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1002 #06 Y:2019 | 06 | 2019 | Reduce illumination to minimum necessary levels | $5,631 | - | |
| UD1002 #05 Y:2019 | 05 | 2019 | Utilize higher efficiency lamps and/or ballasts | $21,973 | $39,240 | |
| UD1002 #04 Y:2019 | 04 | 2019 | Install outside air damper / economizer on hvac unit | $5,466 | $5,200 | |
| UD1002 #03 Y:2019 | 03 | 2019 | Install compressor air intakes in coolest locations | $881 | $1,500 | |
| UD1002 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,379 | $1,000 | |
| UD1002 #01 Y:2019 | 01 | 2019 | Reduce the pressure of compressed air to the minimum required | $5,369 | $4,400 | |
| UD1001 #03 Y:2019 | 03 | 2019 | Utilize higher efficiency lamps and/or ballasts | $13,497 | $16,508 | |
| UD1001 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $705 | $1,200 | |
| UD1001 #01 Y:2019 | 01 | 2019 | Reduce the pressure of compressed air to the minimum required | $3,285 | $4,400 | |
| UD0918 #09 Y:2014 | 09 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $537 | $1,000 | |
| UD0918 #08 Y:2014 | 08 | 2014 | Recover waste heat from equipment | $3,773 | $4,785 | |
| UD0918 #07 Y:2014 | 07 | 2014 | Use / purchase optimum sized compressor | $8,952 | $45,000 | |
| UD0918 #06 Y:2014 | 06 | 2014 | Install motor voltage controller on lightly loaded motors | $11,416 | $23,545 | |
| UD0918 #05 Y:2014 | 05 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $5,325 | - | |
| UD0918 #04 Y:2014 | 04 | 2014 | Develop a repair/replace policy | $58,864 | $75,499 | |
| UD0918 #03 Y:2014 | 03 | 2014 | Use radiant heater for spot heating | $4,208 | $1,050 | |
| UD0918 #02 Y:2014 | 02 | 2014 | Shift from daytime to nighttime operation | $1,098 | - | |
| UD0918 #01 Y:2014 | 01 | 2014 | Meter recycled water (to reduce sewer charges) | $12,159 | $700 |