ITAC Assessment: UA0305
ITAC logo
ITAC Assessment: UA0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Flow Control Instruments
NAICS 332721: Precision Turned Product Manufacturing
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 75,000
ft2
Annual Production 270,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,534 4,945,200
kWh
Electricity Demand $195,370 11,384
kW-mo/yr
Electricity Fees $44,022 -
Natural Gas $7,702 759
MMBtu
TOTAL YEARLY COSTS $611,628
RECOMMENDED SAVINGS* $236,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $140,833 $2,348,000 $118,489
1,607,723
kWh
$12,081
-
kW-mo/yr
$10,263
02 2.7232: Replace existing hvac unit with high efficiency model $74,515 $413,476 $42,882
581,852
kWh
$26,203
-
kW-mo/yr
$5,430
03 2.7241: Install outside air damper / economizer on hvac unit $8,451 $7,095 $7,835
106,315
kWh
- $616
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,711 $900 $6,085
82,564
kWh
$1,064
-
kW-mo/yr
$562
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,749 $8,591 $1,622
22,002
kWh
- $127
06 2.7135: Install occupancy sensors $695 $334 $644
8,733
kWh
- $51
07 2.3212: Optimize plant power factor $2,261 $7,518 - - $2,261
TOTAL RECOMMENDED $236,215 $2,785,914 $177,557
2,409,189
kWh
$39,348
-
kW-mo/yr
$19,310
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs