ITAC Assessment: CL2014
ITAC logo
ITAC Assessment: CL2014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product various injected molded plastic shapes, lids, syringes, parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 107,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $468,386 13,183,134
kWh
Electricity Demand $289,307 22,552
kW-mo/yr
Electricity Fees $4,446 -
Natural Gas $623 48
MMBtu
Waste Disposal Costs
Water Usage $8,337 3,626
Tgal
Water Disposal $5,095 3,626
Tgal
TOTAL YEARLY COSTS $776,194
RECOMMENDED SAVINGS* $63,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $51,784 $23,313 $33,602
945,763
kWh
$18,182
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $10,901 $2,295 $10,901
306,819
kWh
- -
03 3.4159: Replace treated water with well / surface water $922 $862 - - $922
-
Tgal
TOTAL RECOMMENDED $63,607 $26,470 $44,503
1,252,582
kWh
$18,182
-
kW-mo/yr
$922
-
Tgal
TOTAL IMPLEMENTED $62,685 $25,608 $44,503
1,252,582
kWh
$18,182
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs