| Assessment Year | 2026 |
|---|---|
| Principal Product | Valves, fittings and regulators |
| NAICS | 332721: Precision Turned Product Manufacturing |
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 82 |
| Plant Area |
70,000
ft2
|
| Annual Production | 270,000
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $219,659 | 2,851,731 |
kWh
|
$0.077 |
| Electricity Demand | $97,546 | 6,672 |
kW-mo/yr
|
$14.62 |
| Electricity Fees | $13,778 | - |
|
- |
| Natural Gas | $48,198 | 4,626 |
MMBtu
|
$10.42 |
| TOTAL YEARLY COSTS | $379,181 | |||
| RECOMMENDED SAVINGS* | $197,029 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $53,957 | $247,000 |
$23,920
310,643
kWh
|
$27,793
-
kW-mo/yr
|
$2,244 | - | |
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $6,154 | $51,120 |
$5,778
75,035
kWh
|
- | $251 |
$125
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $4,897 | $8,397 | - | - | - |
$4,897
-
MMBtu
|
|
| 04 | 2.9114: Use solar heat to make electricty | $122,315 | $1,809,180 |
$108,455
1,408,503
kWh
|
$8,772
-
kW-mo/yr
|
$5,088 | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $3,604 | $1,012 |
$2,279
29,594
kWh
|
$1,175
-
kW-mo/yr
|
$150 | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,102 | $900 |
$3,787
49,182
kWh
|
$2,061
-
kW-mo/yr
|
$254 | - | |
| TOTAL RECOMMENDED | $197,029 | $2,117,609 |
$144,219
1,872,957
kWh
|
$39,801
-
kW-mo/yr
|
$7,987 |
$5,022
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs