ITAC Assessment: SU0577
ITAC logo
ITAC Assessment: SU0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bottled Beverages - water, apple cider, apple/fruit fiber powder, bulk apple juice
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 255,000
ft2
Annual Production 23,000,000
units
Production Hrs. Annual 5,200
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $699,074 13,885,618
kWh
Electricity Demand $108,005 34,124
kW-mo/yr
Electricity Fees $30,815 -
Natural Gas $119,157 7,688
MMBtu
Other Gas $49,006 1
MMBtu
Waste Disposal Costs
Water Usage $414,239 115,272
Tgal
TOTAL YEARLY COSTS $1,420,296
RECOMMENDED SAVINGS* $21,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,400 - - $5,400
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $1,364 - $1,364
27,272
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $299 $63 $299
5,990
kWh
- -
04 2.2511: Insulate bare equipment $1,304 $446 - - $1,304
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,033 $372 $1,033
20,655
kWh
- -
06 2.2437: Recover waste heat from equipment $1,135 $2,941 $1,135
22,705
kWh
- -
07 2.7234: Use heat pump for space conditioning $11,453 $34,327 $(-10,483.0)
(-209,664)
kWh
- $21,936
-
MMBtu
TOTAL RECOMMENDED $21,989 $38,148 $(-6,651.9)
(-133,043)
kWh
$5,400
-
kW-mo/yr
$23,240
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs