| Assessment Year | 2025 |
|---|---|
| Principal Product | Bottled Beverages - water, apple cider, apple/fruit fiber powder, bulk apple juice |
| NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 350 |
| Plant Area |
255,000
ft2
|
| Annual Production | 23,000,000
units
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $699,074 | 13,885,618 |
kWh
|
$0.050 | |
| Electricity Demand | $108,005 | 34,124 |
kW-mo/yr
|
$3.17 | |
| Electricity Fees | $30,815 | - |
|
- | |
| Natural Gas | $119,157 | 7,688 |
MMBtu
|
$15.50 | |
| Other Gas | $49,006 | 1 |
MMBtu
|
$49,006.35 | |
| Waste Disposal Costs | |||||
| Water Usage | $414,239 | 115,272 |
Tgal
|
$3.59 | |
| TOTAL YEARLY COSTS | $1,420,296 | ||||
| RECOMMENDED SAVINGS* | $21,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,400 | - | - |
$5,400
-
kW-mo/yr
|
- | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $1,364 | - |
$1,364
27,272
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $299 | $63 |
$299
5,990
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $1,304 | $446 | - | - |
$1,304
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,033 | $372 |
$1,033
20,655
kWh
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,135 | $2,941 |
$1,135
22,705
kWh
|
- | - | |
| 07 | 2.7234: Use heat pump for space conditioning | $11,453 | $34,327 |
$(-10,483.0)
(-209,664)
kWh
|
- |
$21,936
-
MMBtu
|
|
| TOTAL RECOMMENDED | $21,989 | $38,148 |
$(-6,651.9)
(-133,043)
kWh
|
$5,400
-
kW-mo/yr
|
$23,240
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs