Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

721

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Machine shops
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0588 #12 Y:2025 Use solar heat to make electricty $50,535 $467,049
SU0588 #11 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $377 $1,928
SU0588 #10 Y:2025 Install back-up equipment $30,784 $86,000
SU0588 #09 Y:2025 Install occupancy sensors $1,049 $2,285
SU0588 #08 Y:2025 Conserve energy by efficient use of vending machines $232 $368
SU0588 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,289 $1,441
SU0588 #06 Y:2025 Use or replace with energy efficient substitutes $422 $461
SU0588 #05 Y:2025 Install compressor air intakes in coolest locations $559 $471
SU0588 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $209
SU0588 #03 Y:2025 Use or replace with energy efficient substitutes $914 $74
SU0588 #02 Y:2025 Reduce space conditioning during non-working hours $775 -
SU0588 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,279 -
UU0280 #05 Y:2025 Use solar heat to make electricty $27,818 $406,200
UU0280 #04 Y:2025 Optimize plant power factor $4,000 $25,575
UU0280 #03 Y:2025 Eliminate or reduce compressed air usage $5,305 $5,305
UU0280 #02 Y:2025 Install occupancy sensors $8,865 $28,400
UU0280 #01 Y:2025 Utilize a less expensive cooling method $21,325 $186,166
OK1152 #09 Y:2025 Reschedule plant operations or reduce load to avoid peaks $6,238 -
OK1152 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $9,737 $16,196
OK1152 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,701 $9,073