ITAC Assessment: MU0092
ITAC logo
ITAC Assessment: MU0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Respiratory Face Masks
NAICS 332710: Machine Shops
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 214
Plant Area 91,868
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,269 2,678,392
kWh
Electricity Demand $48,298 6,661
kW-mo/yr
Electricity Fees $39,566 -
Natural Gas $48,218 5,969
MMBtu
Other Gas $5,755 1
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $405,107
RECOMMENDED SAVINGS* $10,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $7,256 $27,700 - - $7,256
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $1,354 $380 $606
6,187
kWh
$245
-
kW-mo/yr
$503
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,264 $12,182 $1,264
12,897
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50 - $46
473
kWh
$4
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $231 $984 $220
2,244
kWh
$11
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,156 $41,246 $2,137
21,801
kWh
$260
-
kW-mo/yr
$7,759
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs