Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

337

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other fabricated wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0466 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,327 $3,414
MI0466 #05 Y:2025 Optimize plant power factor $8,024 $18,830
MI0466 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,309 $4,560
MI0466 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,332 $1,020
MI0466 #02 Y:2025 Change rate schedules or other changes in utility service $1,368 $100
MI0466 #01 Y:2025 Change rate schedules or other changes in utility service $58,107 $6,400
WM0235 #04 Y:2024 Lower temperature during the winter season and vice-versa $1,413 -
WM0235 #03 Y:2024 Reduce space conditioning during non-working hours $2,882 -
WM0235 #02 Y:2024 Install compressor air intakes in coolest locations $2,895 $12,010
WM0235 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,877 $3,500
AM0900 #06 Y:2023 Recover waste heat from equipment $29,310 $69,700
AM0900 #05 Y:2023 Use synthetic lubricant $727 $546
AM0900 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,024 $546
AM0900 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $1,283 $273
AM0900 #02 Y:2023 Optimize plant power factor $19,139 $30,070
AM0900 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,923 $10,333
UC2310 #13 Y:2023 Install timers and/or thermostats $1,947 $1,980
UC2310 #12 Y:2023 Eliminate or reduce compressed air usage $791 $1,804
UC2310 #11 Y:2023 Utilize controls to operate equipment only when needed $4,068 $75
UC2310 #10 Y:2023 Reduce the pressure of compressed air to the minimum required $1,459 $150