| Assessment Year | 2024 |
|---|---|
| Principal Product | Coil springs |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 137 |
| Plant Area |
100,000
ft2
|
| Annual Production | 468,000
units
|
| Production Hrs. Annual | 2,875
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,904 | 2,767,462 |
kWh
|
$0.046 |
| Electricity Demand | $103,106 | 10,136 |
kW-mo/yr
|
$10.17 |
| Electricity Fees | $6,504 | - |
|
- |
| Natural Gas | $177,591 | 24,733 |
MMBtu
|
$7.18 |
| TOTAL YEARLY COSTS | $415,105 | |||
| RECOMMENDED SAVINGS* | $57,406 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,923 | $10,333 |
$5,923
128,773
kWh
|
- | - | |
| 02 | 2.3212: Optimize plant power factor | $19,139 | $30,070 | - |
$19,139
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,283 | $273 |
$323
7,010
kWh
|
$960
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,024 | $546 |
$517
11,252
kWh
|
$507
-
kW-mo/yr
|
- | |
| 05 | 2.4314: Use synthetic lubricant | $727 | $546 |
$367
7,978
kWh
|
$360
-
kW-mo/yr
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $29,310 | $69,700 | - | - |
$29,310
-
MMBtu
|
|
| TOTAL RECOMMENDED | $57,406 | $111,468 |
$7,130
155,013
kWh
|
$20,966
-
kW-mo/yr
|
$29,310
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs