ITAC Assessment: ME0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Metal Coil Handlers
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,496 551,876
kWh
LPG $1,197 96
MMBtu
Fuel Oil #2 $12,879 1,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4239: Eliminate or reduce compressed air usage $787 $1,250 $787
7,620
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $368 $400 - $368
-
MMBtu
03 2.1232: Keep boiler tubes clean $357 $200 - $357
-
MMBtu
TOTAL RECOMMENDED $1,512 $1,850 $787
7,620
kWh
$725
-
MMBtu
TOTAL IMPLEMENTED $725 $600 - $725
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs