ITAC Assessment: WM0235
ITAC logo
ITAC Assessment: WM0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Processing and Metal Fabrication
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 130,000
ft2
Annual Production 29,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,002 1,784,514
kWh
Electricity Demand $75,518 6,360
kW-mo/yr
Electricity Fees $34,532 -
Natural Gas $10,710 1,027
MMBtu
TOTAL YEARLY COSTS $256,762
RECOMMENDED SAVINGS* $11,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,877 $3,500 $3,193
42,017
kWh
$684
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $2,895 $12,010 $2,385
31,377
kWh
$511
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $2,882 - $1,013
13,335
kWh
$356
-
kW-mo/yr
$1,512
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $1,413 - $974
12,819
kWh
$207
-
kW-mo/yr
$232
-
MMBtu
TOTAL RECOMMENDED $11,067 $15,510 $7,566
99,548
kWh
$1,758
-
kW-mo/yr
$1,744
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs