Assessment Year | 2025 |
---|---|
Principal Product | Steel Processing and Metal Fabrication |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
130,000
ft2
|
Annual Production | 29,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,002 | 1,784,514 |
kWh
|
$0.076 |
Electricity Demand | $75,518 | 6,360 |
kW-mo/yr
|
$11.87 |
Electricity Fees | $34,532 | - |
|
- |
Natural Gas | $10,710 | 1,027 |
MMBtu
|
$10.43 |
TOTAL YEARLY COSTS | $256,762 | |||
RECOMMENDED SAVINGS* | $11,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,877 | $3,500 |
$3,193
42,017
kWh
|
$684
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,895 | $12,010 |
$2,385
31,377
kWh
|
$511
-
kW-mo/yr
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $2,882 | - |
$1,013
13,335
kWh
|
$356
-
kW-mo/yr
|
$1,512
-
MMBtu
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $1,413 | - |
$974
12,819
kWh
|
$207
-
kW-mo/yr
|
$232
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,067 | $15,510 |
$7,566
99,548
kWh
|
$1,758
-
kW-mo/yr
|
$1,744
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs