Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0462 #05 Y:2015 Use waste heat from hot flue gases to preheat $8,415 $12,500
SF0462 #04 Y:2015 Use insulation in furnaces to facilitate heating / cooling $2,104 $1,941
SF0462 #03 Y:2015 Recharge batteries on during off-peak demand periods $1,475 $793
SF0462 #02 Y:2015 Turn off equipment when not in use $2,285 -
SF0462 #01 Y:2015 Repair and eliminate steam leaks $3,033 -
WM0060 #07 Y:2014 Install vinyl strip / high speed / air curtain doors $680 $255
WM0060 #06 Y:2014 Install occupancy sensors $786 $3,000
WM0060 #05 Y:2014 Repair and eliminate steam leaks $1,080 $110
WM0060 #04 Y:2014 Use insulation in furnaces to facilitate heating / cooling $3,701 $1,218
WM0060 #03 Y:2014 Lower temperature during the winter season and vice-versa $5,355 -
WM0060 #02 Y:2014 Use or replace with energy efficient substitutes $7,761 $2,291
WM0060 #01 Y:2014 Replace boiler $24,302 $20,000
MA0736 #08 Y:2014 Reduce the pressure of compressed air to the minimum required $655 $500
MA0736 #07 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $2,318 $4,000
MA0736 #06 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $3,069 $6,500
MA0736 #05 Y:2014 Apply for tax-free status for energy purchases $3,360 $500
MA0736 #04 Y:2014 Lower temperature during the winter season and vice-versa $7,218 $4,000
MA0736 #03 Y:2014 Reduce ventilation air $7,297 $2,550
MA0736 #02 Y:2014 Optimize plant power factor $14,457 $14,774
MA0736 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $21,138 $109,865