Assessment Year | 2015 |
---|---|
Principal Product | Springs, Stampings, Wire Forms |
NAICS | 332613: Spring Manufacturing |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
67,500
ft2
|
Annual Production | 500
ton
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,992 | 819,997 |
kWh
|
$0.056 |
Electricity Demand | $14,446 | 2,704 |
kW-mo/yr
|
$5.34 |
Electricity Fees | $14,114 | - |
|
- |
Natural Gas | $50,253 | 4,959 |
MMBtu
|
$10.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,363 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $24,302 | $20,000 | - | - |
$14,302
-
MMBtu
|
$10,000 | |
02 | 2.4322: Use or replace with energy efficient substitutes | $7,761 | $2,291 |
$7,761
138,342
kWh
|
- | - | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $5,355 | - | - | - |
$5,355
-
MMBtu
|
- | |
04 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $3,701 | $1,218 | - | - |
$3,701
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $1,080 | $110 |
$882
15,714
kWh
|
$199
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $786 | $3,000 |
$507
9,043
kWh
|
$279
-
kW-mo/yr
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $680 | $255 | - | - |
$680
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $43,665 | $26,874 |
$9,150
163,099
kWh
|
$478
-
kW-mo/yr
|
$24,038
-
MMBtu
|
$10,000 | ||
TOTAL IMPLEMENTED | $19,363 | $6,874 |
$9,150
163,099
kWh
|
$478
-
kW-mo/yr
|
$9,736
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs