Assessment Year 1993
Principal Product pneumatic/electrical hand tools
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area 229,750
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,482 2,987,984
kWh
Natural Gas $33,000 9,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,403 $500 $10,403
221,278
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $691 $200 $691
14,654
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $161 $465 $161
3,517
kWh
-
04 2.7135: Install occupancy sensors $3,872 $2,343 $3,872
82,356
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,254 $272 $1,254
26,671
kWh
-
06 2.2511: Insulate bare equipment $25 $43 - $25
-
MMBtu
TOTAL RECOMMENDED $16,406 $3,823 $16,381
348,476
kWh
$25
-
MMBtu
TOTAL IMPLEMENTED $11,682 $815 $11,657
247,949
kWh
$25
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs