IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Avionics Systems
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 125,455
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,496
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,891 2,182,500
kWh
Electricity Demand $58,229 7,710
kW-mo/yr
Electricity Fees $39,671 -
TOTAL YEARLY COSTS $266,791
RECOMMENDED SAVINGS* $59,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3191: Use demand controller or load shedder $15,842 $11,742 $11,764
152,775
kWh
$4,078
-
kW-mo/yr
02 2.7141: Lower light fixtures in high ceiling areas $12,457 $4,590 $10,978
142,572
kWh
$1,479
-
kW-mo/yr
03 2.2437: Recover waste heat from equipment $9,829 $2,419 $9,829
127,650
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $8,565 $25,400 $8,565
111,241
kWh
-
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $7,688 - $7,688
99,845
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,461 $390 $2,461
31,959
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $1,930 - $1,930
25,070
kWh
-
08 2.7135: Install occupancy sensors $1,065 $1,710 $1,065
13,826
kWh
-
TOTAL RECOMMENDED $59,837 $46,251 $54,280
704,938
kWh
$5,557
-
kW-mo/yr
TOTAL IMPLEMENTED $38,815 $16,261 $34,737
451,125
kWh
$4,078
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs