ITAC Assessment: AS0141
ITAC logo
ITAC Assessment: AS0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Specialty bakery items
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 12,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 8,664
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,887 748,535
kWh
Natural Gas $30,569 5,739
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,522 $4,250 - $1,522
-
MMBtu
02 2.4133: Use most efficient type of electric motors $991 $849 $991
15,826
kWh
-
03 2.2622: Replace existing chiller with high efficiency model $4,234 $9,000 $4,234
61,547
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,099 $7,115 $5,099
84,701
kWh
-
05 2.7135: Install occupancy sensors $921 $975 $921
17,878
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $557 - $557
9,379
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $204 $240 $204
3,517
kWh
-
TOTAL RECOMMENDED $13,528 $22,429 $12,006
192,848
kWh
$1,522
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs