Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Open-Die Steel Forgings
NAICS
n/a
SIC 3426:
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 94,500
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,902 2,378,077
kWh
Electricity Demand $133,670 7,860
kW-mo/yr
Electricity Fees $8,710 -
Natural Gas $401,348 106,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,707 $9,821 $4,781
179,953
kWh
$4,926
-
kW-mo/yr
- - -
02 2.7229: Air condition only space necessary $1,684 $400 $1,684
170,574
kWh
- - - -
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,436 $600 - - $1,436
-
MMBtu
- -
04 3.4114: Replace city water with recycled water via cooling tower $2,058 $2,250 - - - $2,058
-
Tgal
-
05 4.811: Demolish old building to reduce tax and insurance bills $48,776 $103,584 - - - - $48,776
TOTAL RECOMMENDED $63,661 $116,655 $6,465
350,527
kWh
$4,926
-
kW-mo/yr
$1,436
-
MMBtu
$2,058
-
Tgal
$48,776
TOTAL IMPLEMENTED $11,391 $10,221 $6,465
350,527
kWh
$4,926
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs