Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product mozzarella
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 415
Plant Area 457,000
ft2
Annual Production 360,000,000
lb
Production Hrs. Annual 8,376
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,407,024 104,597,535
kWh
Electricity Demand $2,407,023 243,429
kW-mo/yr
Electricity Fees $749 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $695,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $342,345

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,946 - $7,289
-
kWh
$5,657
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $111,472 $82,700 $91,870
1,039,800
kWh
$19,602
-
kW-mo/yr
-
03 2.3132: Recharge batteries on during off-peak demand periods $2,913 $7,000 $1,687
-
kWh
$1,226
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $230,613 $69,350 $192,501
2,206,318
kWh
$38,112
-
kW-mo/yr
-
05 4.451: Add additional production shift $337,500 $5,000 - - $337,500
06 2.6218: Turn off equipment when not in use $260 - $260
2,945
kWh
- -
TOTAL RECOMMENDED $695,704 $164,050 $293,607
3,249,063
kWh
$64,597
-
kW-mo/yr
$337,500
TOTAL IMPLEMENTED $342,345 $152,050 $284,631
3,249,063
kWh
$57,714
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs