ITAC Assessment: OR0100
ITAC logo
ITAC Assessment: OR0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BAKED GOODS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area
n/a
Annual Production 5,900,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $765,067 19,991,501
kWh
Natural Gas $165,466 48,329
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $22,304 - $22,304
680,246
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,888 $2,677 $3,524
84,994
kWh
$(-636.0)
03 2.4133: Use most efficient type of electric motors $1,591 $2,350 $1,591
41,032
kWh
-
04 2.3212: Optimize plant power factor $6,420 $13,800 $6,420
-
kWh
-
TOTAL RECOMMENDED $33,203 $18,827 $33,839
806,272
kWh
$(-636.0)
TOTAL IMPLEMENTED $28,724 $13,800 $28,724
680,246
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs