Assessment Year | 2001 |
---|---|
Principal Product | PET Fiber |
NAICS |
n/a
|
SIC | 2299: Textile goods, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
521,000
ft2
|
Annual Production | 176,000,000
lb
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,432,109 | 48,233,743 |
kWh
|
$0.050 |
Natural Gas | $1,850,924 | 343,641 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,699,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.2163: Use minimum steam operating pressure | $50,880 | $75,000 | n/a | - |
$50,880
-
MMBtu
|
- |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $45,320 | $55,800 | n/a | - |
$45,320
-
MMBtu
|
- |
03 | 2.4131: Size electric motors for peak operating efficiency | $17,930 | $14,400 | n/a |
$17,930
512,263
kWh
|
- | - |
04 | 2.4224: Upgrade controls on compressors | $10,878 | $5,050 | n/a |
$10,878
310,800
kWh
|
- | - |
05 | 3.6122: Install solid waste incinerator for heat | $1,166,246 | $1,875,000 | n/a | - |
$1,041,246
-
MMBtu
|
$125,000
-
lb
|
06 | 2.2511: Insulate bare equipment | $152,112 | $51,570 | n/a | - |
$152,112
-
MMBtu
|
- |
07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $101,860 | $27,240 | n/a | - |
$101,860
-
MMBtu
|
- |
08 | 2.1112: Heat oil to proper temperature for good atomization | $154,042 | $7,500 | n/a | - |
$154,042
-
MMBtu
|
- |
TOTAL RECOMMENDED | $1,699,268 | $2,111,560 |
$28,808
823,063
kWh
|
$1,545,460
-
MMBtu
|
$125,000
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs