Assessment Year | 1996 |
---|---|
Principal Product | Steel Strappings |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
117,000
ft2
|
Annual Production | 69,287,400
lb
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $306,285 | 12,439,332 |
kWh
|
$0.025 |
Electricity Demand | $247,821 | 32,260 |
kW-mo/yr
|
$7.68 |
Electricity Fees | $28,220 | - |
|
- |
Natural Gas | $130,877 | 53,412 |
MMBtu
|
$2.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,093 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,629 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $1,698 | $4,800 |
$1,698
127,198
kWh
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,333 | $1,450 |
$549
23,154
kWh
|
$784
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $354 | $365 |
$70
2,931
kWh
|
$284
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $22,916 | $56,250 |
$15,334
650,351
kWh
|
$10,582
-
kW-mo/yr
|
- | - | - | $(-3,000.0) | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $208 | $680 |
$208
8,792
kWh
|
- | - | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $610 | $747 | - | - |
$610
-
MMBtu
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $2,734 | $252 |
$1,586
67,116
kWh
|
$1,148
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $240 | $1,000 | - | - | - |
$800
-
Tgal
|
$(-400.0)
-
gal
|
$(-160.0) | |
TOTAL RECOMMENDED | $30,093 | $65,544 |
$19,445
879,542
kWh
|
$12,798
-
kW-mo/yr
|
$610
-
MMBtu
|
$800
-
Tgal
|
$(-400.0)
-
gal
|
$(-3,160.0) | ||
TOTAL IMPLEMENTED | $4,629 | $2,747 |
$2,413
101,993
kWh
|
$2,216
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs