ITAC Assessment: MA0394
ITAC logo
ITAC Assessment: MA0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product electronic components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 320,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $582,832 34,518
kW-mo/yr
Natural Gas $105,512 18,857
MMBtu
Fuel Oil #4 $59,998 14,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $361,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $352,927

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings By-product Production Savings
01 4.521: Clear and rent existing space $262,500 - - - - $262,500
02 2.7142: Utilize higher efficiency lamps and/or ballasts $89,097 $320,340 $63,991
971,571
kWh
$25,106
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,317 $24,908 $2,778
43,083
kWh
$1,539
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,246 $4,225 $2,333
35,463
kWh
$913
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,330 $271 $1,330
20,223
kWh
- - -
06 3.1175: Use a different or recycled raw material $1,120 - - - $1,120
-
lb
-
TOTAL RECOMMENDED $361,610 $349,744 $70,432
1,070,340
kWh
$27,558
-
kW-mo/yr
$1,120
-
lb
$262,500
TOTAL IMPLEMENTED $352,927 $320,611 $65,321
991,794
kWh
$25,106
-
kW-mo/yr
- $262,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs