Assessment Year | 2008 |
---|---|
Principal Product | Fiberglass Tubs and Showers |
NAICS | 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing |
SIC | 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories |
Sales Range | $100 M to 500M |
# of Employees | 152 |
Plant Area |
147,000
ft2
|
Annual Production | 115,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $295,291 | 3,958,250 |
kWh
|
$0.075 |
Natural Gas | $390,067 | 41,122 |
MMBtu
|
$9.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,808 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $89,303 | $52,321 | - | - | - |
$52,853
-
lb
|
- | $36,450 | |
02 | 2.6124: Establish equipment maintenance schedule | $44,200 | $27,200 | - | - | - | - | $44,200 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,636 | $4,640 |
$8,732
145,531
kWh
|
$2,904
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,233 | $9,804 |
$2,528
38,896
kWh
|
$1,136
-
kW-mo/yr
|
$1,569
-
MMBtu
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,153 | - |
$4,166
69,434
kWh
|
$987
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,172 | $180 |
$2,380
39,674
kWh
|
$792
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $2,130 | $1,260 |
$1,248
20,800
kWh
|
$882
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,849 | $14,505 |
$3,849
64,152
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $164,676 | $109,910 |
$22,903
378,487
kWh
|
$6,701
-
kW-mo/yr
|
$1,569
-
MMBtu
|
$52,853
-
lb
|
$44,200 | $36,450 | ||
TOTAL IMPLEMENTED | $14,808 | $4,820 |
$11,112
185,205
kWh
|
$3,696
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs