ITAC Assessment: UD0243
ITAC logo
ITAC Assessment: UD0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COMMERCIAL STEAMERS
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,903 1,516,999
kWh
Natural Gas $44,189 9,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,000 $10,000 $12,000
-
kWh
- -
02 2.4322: Use or replace with energy efficient substitutes $3,646 $11,950 $3,646
49,824
kWh
- -
03 2.2437: Recover waste heat from equipment $2,457 $8,050 - $2,457
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,388 $600 $1,121
12,016
kWh
- $267
05 2.7261: Install timers and/or thermostats $3,354 $1,200 - $3,354
-
MMBtu
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $812 - $812
11,137
kWh
- -
TOTAL RECOMMENDED $23,657 $31,800 $17,579
72,977
kWh
$5,811
-
MMBtu
$267
TOTAL IMPLEMENTED $17,554 $11,800 $13,933
23,153
kWh
$3,354
-
MMBtu
$267
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs