ITAC Assessment: MA0736
ITAC logo
ITAC Assessment: MA0736
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Springs and stampings
NAICS 332613: Spring Manufacturing
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 150,000
ft2
Annual Production 433,000,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,826 1,809,500
kWh
Electricity Demand $86,945 7,001
kW-mo/yr
Electricity Fees $(-6,875.0) -
Natural Gas $55,103 4,763
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,138 $109,865 $12,605
154,283
kWh
$8,533
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $14,457 $14,774 - $14,457
-
kW-mo/yr
- -
03 2.7314: Reduce ventilation air $7,297 $2,550 $480
5,872
kWh
- $6,817
-
MMBtu
-
04 2.7221: Lower temperature during the winter season and vice-versa $7,218 $4,000 $2,704
33,094
kWh
- $4,514
-
MMBtu
-
05 2.8121: Apply for tax-free status for energy purchases $3,360 $500 - - - $3,360
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,069 $6,500 $3,069
37,563
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,318 $4,000 $2,318
28,367
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $655 $500 $655
8,013
kWh
- - -
TOTAL RECOMMENDED $59,512 $142,689 $21,831
267,192
kWh
$22,990
-
kW-mo/yr
$11,331
-
MMBtu
$3,360
TOTAL IMPLEMENTED $48,491 $133,139 $17,627
215,744
kWh
$22,990
-
kW-mo/yr
$4,514
-
MMBtu
$3,360
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs