Assessment Year | 2014 |
---|---|
Principal Product | Springs and stampings |
NAICS | 332613: Spring Manufacturing |
SIC | 3493: Steel Springs, Except Wire |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
150,000
ft2
|
Annual Production | 433,000,000
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,826 | 1,809,500 |
kWh
|
$0.082 |
Electricity Demand | $86,945 | 7,001 |
kW-mo/yr
|
$12.42 |
Electricity Fees | $(-6,875.0) | - |
|
- |
Natural Gas | $55,103 | 4,763 |
MMBtu
|
$11.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,491 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,138 | $109,865 |
$12,605
154,283
kWh
|
$8,533
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $14,457 | $14,774 | - |
$14,457
-
kW-mo/yr
|
- | - | |
03 | 2.7314: Reduce ventilation air | $7,297 | $2,550 |
$480
5,872
kWh
|
- |
$6,817
-
MMBtu
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $7,218 | $4,000 |
$2,704
33,094
kWh
|
- |
$4,514
-
MMBtu
|
- | |
05 | 2.8121: Apply for tax-free status for energy purchases | $3,360 | $500 | - | - | - | $3,360 | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,069 | $6,500 |
$3,069
37,563
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,318 | $4,000 |
$2,318
28,367
kWh
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $655 | $500 |
$655
8,013
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $59,512 | $142,689 |
$21,831
267,192
kWh
|
$22,990
-
kW-mo/yr
|
$11,331
-
MMBtu
|
$3,360 | ||
TOTAL IMPLEMENTED | $48,491 | $133,139 |
$17,627
215,744
kWh
|
$22,990
-
kW-mo/yr
|
$4,514
-
MMBtu
|
$3,360 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs