ITAC Assessment: IC0173
ITAC logo
ITAC Assessment: IC0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Non-Dairy Icing and Toppings
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 100
Plant Area 75,000
ft2
Annual Production 85,000,000
lb
Production Hrs. Annual 6,068
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $717,855 8,897,283
kWh
Electricity Demand $90,543 15,864
kW-mo/yr
Natural Gas $194,957 29,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7111: Reduce illumination to minimum necessary levels $8,578 $14,911 $7,526
92,913
kWh
$1,050
-
kW-mo/yr
$2
02 2.7111: Reduce illumination to minimum necessary levels $4,492 - $3,830
47,279
kWh
$660
-
kW-mo/yr
$2
03 2.7135: Install occupancy sensors $967 $682 $846
10,447
kWh
$119
-
kW-mo/yr
$2
04 2.7111: Reduce illumination to minimum necessary levels $188 $497 $171
2,113
kWh
$17
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $310 $150 $247
3,054
kWh
$63
-
kW-mo/yr
-
06 2.7111: Reduce illumination to minimum necessary levels $2,982 $5,951 $2,603
32,135
kWh
$379
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $4,649 $3,267 $4,080
50,376
kWh
$569
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $281 - $281
3,471
kWh
- -
09 2.4224: Upgrade controls on compressors $5,015 - $5,015
61,916
kWh
- -
10 2.4221: Install compressor air intakes in coolest locations $287 $610 $203
2,509
kWh
$84
-
kW-mo/yr
-
11 2.4322: Use or replace with energy efficient substitutes $146 - $146
1,800
kWh
- -
TOTAL RECOMMENDED $27,895 $26,068 $24,948
308,013
kWh
$2,941
-
kW-mo/yr
$6
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs