Assessment Year | 2010 |
---|---|
Principal Product | Non-Dairy Icing and Toppings |
NAICS | 311412: Frozen Specialty Food Manufacturing |
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 100 |
Plant Area |
75,000
ft2
|
Annual Production | 85,000,000
lb
|
Production Hrs. Annual | 6,068
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $717,855 | 8,897,283 |
kWh
|
$0.081 |
Electricity Demand | $90,543 | 15,864 |
kW-mo/yr
|
$5.71 |
Natural Gas | $194,957 | 29,214 |
MMBtu
|
$6.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $8,578 | $14,911 |
$7,526
92,913
kWh
|
$1,050
-
kW-mo/yr
|
$2 | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $4,492 | - |
$3,830
47,279
kWh
|
$660
-
kW-mo/yr
|
$2 | |
03 | 2.7135: Install occupancy sensors | $967 | $682 |
$846
10,447
kWh
|
$119
-
kW-mo/yr
|
$2 | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $188 | $497 |
$171
2,113
kWh
|
$17
-
kW-mo/yr
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $310 | $150 |
$247
3,054
kWh
|
$63
-
kW-mo/yr
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $2,982 | $5,951 |
$2,603
32,135
kWh
|
$379
-
kW-mo/yr
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $4,649 | $3,267 |
$4,080
50,376
kWh
|
$569
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $281 | - |
$281
3,471
kWh
|
- | - | |
09 | 2.4224: Upgrade controls on compressors | $5,015 | - |
$5,015
61,916
kWh
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $287 | $610 |
$203
2,509
kWh
|
$84
-
kW-mo/yr
|
- | |
11 | 2.4322: Use or replace with energy efficient substitutes | $146 | - |
$146
1,800
kWh
|
- | - | |
TOTAL RECOMMENDED | $27,895 | $26,068 |
$24,948
308,013
kWh
|
$2,941
-
kW-mo/yr
|
$6 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs