| Assessment Year | 1997 |
|---|---|
| Principal Product | fabricated metal products |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
31,800
ft2
|
| Annual Production | 570,000
thousand feet
|
| Production Hrs. Annual | 2,574
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $14,790 | 731,829 |
kWh
|
$0.020 |
| Electricity Demand | $51,369 | 3,625 |
kW-mo/yr
|
$14.17 |
| Electricity Fees | $497 | - |
|
- |
| Natural Gas | $45,528 | 12,411 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $5,110 | $5,390 |
$1,040
56,272
kWh
|
- |
$4,070
-
MMBtu
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $835 | $90 |
$381
18,464
kWh
|
$454
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $840 | - |
$840
43,376
kWh
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $800 | $330 |
$180
9,379
kWh
|
$620
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,820 | - | - | - | - |
$1,820
-
lb
|
- | |
| 06 | 3.6192: Use a less expensive method of waste removal | $410 | - | - | - | - | - |
$410
-
lb
|
|
| 07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $170 | - | - | - | - |
$170
-
lb
|
- | |
| TOTAL RECOMMENDED | $9,985 | $5,810 |
$2,441
127,491
kWh
|
$1,074
-
kW-mo/yr
|
$4,070
-
MMBtu
|
$1,990
-
lb
|
$410
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs