ITAC Assessment: KS2324
ITAC logo
ITAC Assessment: KS2324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Salad Toppings
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 606,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,181,339 16,146,133
kWh
Natural Gas $507,438 73,921
MMBtu
Waste Disposal Costs
Water Usage $13,740 2,806
Tgal
Water Disposal $26,041 2,806
Tgal
TOTAL YEARLY COSTS $1,728,558
RECOMMENDED SAVINGS* $182,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $63,860 $598,739 $63,860
874,793
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,738 $5,480 $7,738
105,996
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $32,201 - $32,201
441,110
kWh
- -
04 2.1135: Repair furnaces and oven doors so that they seal efficiently $12,787 $8,320 - $12,787
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,344 $22,467 $3,306
45,287
kWh
- $3,038
06 2.7135: Install occupancy sensors $2,028 $4,064 $1,548
21,206
kWh
- $480
07 2.2622: Replace existing chiller with high efficiency model $57,559 $312,824 $57,559
788,486
kWh
- -
TOTAL RECOMMENDED $182,517 $951,894 $166,212
2,276,878
kWh
$12,787
-
MMBtu
$3,518
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs