| Assessment Year | 2024 |
|---|---|
| Principal Product | Salad Toppings |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 450 |
| Plant Area |
606,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,181,339 | 16,146,133 |
kWh
|
$0.073 | |
| Natural Gas | $507,438 | 73,921 |
MMBtu
|
$6.86 | |
| Waste Disposal Costs | |||||
| Water Usage | $13,740 | 2,806 |
Tgal
|
$4.90 | |
| Water Disposal | $26,041 | 2,806 |
Tgal
|
$9.28 | |
| TOTAL YEARLY COSTS | $1,728,558 | ||||
| RECOMMENDED SAVINGS* | $182,517 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $63,860 | $598,739 |
$63,860
874,793
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,738 | $5,480 |
$7,738
105,996
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $32,201 | - |
$32,201
441,110
kWh
|
- | - | |
| 04 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $12,787 | $8,320 | - |
$12,787
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,344 | $22,467 |
$3,306
45,287
kWh
|
- | $3,038 | |
| 06 | 2.7135: Install occupancy sensors | $2,028 | $4,064 |
$1,548
21,206
kWh
|
- | $480 | |
| 07 | 2.2622: Replace existing chiller with high efficiency model | $57,559 | $312,824 |
$57,559
788,486
kWh
|
- | - | |
| TOTAL RECOMMENDED | $182,517 | $951,894 |
$166,212
2,276,878
kWh
|
$12,787
-
MMBtu
|
$3,518 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs