Assessment Year | 2024 |
---|---|
Principal Product | Salad Toppings |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
606,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,181,339 | 16,146,133 |
kWh
|
$0.073 | |
Natural Gas | $507,438 | 73,921 |
MMBtu
|
$6.86 | |
Waste Disposal Costs | |||||
Water Usage | $13,740 | 2,806 |
Tgal
|
$4.90 | |
Water Disposal | $26,041 | 2,806 |
Tgal
|
$9.28 | |
TOTAL YEARLY COSTS | $1,728,558 | ||||
RECOMMENDED SAVINGS* | $182,517 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $63,860 | $598,739 |
$63,860
874,793
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,738 | $5,480 |
$7,738
105,996
kWh
|
- | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $32,201 | - |
$32,201
441,110
kWh
|
- | - | |
04 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $12,787 | $8,320 | - |
$12,787
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,344 | $22,467 |
$3,306
45,287
kWh
|
- | $3,038 | |
06 | 2.7135: Install occupancy sensors | $2,028 | $4,064 |
$1,548
21,206
kWh
|
- | $480 | |
07 | 2.2622: Replace existing chiller with high efficiency model | $57,559 | $312,824 |
$57,559
788,486
kWh
|
- | - | |
TOTAL RECOMMENDED | $182,517 | $951,894 |
$166,212
2,276,878
kWh
|
$12,787
-
MMBtu
|
$3,518 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs