42
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0169 #05 Y:2014 | 05 | 2014 | Condense operation into one building | $1,574 | - | |
| MZ0169 #04 Y:2014 | 04 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,080 | $7,000 | |
| MZ0169 #03 Y:2014 | 03 | 2014 | Recover waste heat from equipment | $154 | - | |
| MZ0169 #02 Y:2014 | 02 | 2014 | Install compressor air intakes in coolest locations | $209 | $300 | |
| MZ0169 #01 Y:2014 | 01 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,001 | $600 | |
| WM0060 #07 Y:2014 | 07 | 2014 | Install vinyl strip / high speed / air curtain doors | $680 | $255 | |
| WM0060 #06 Y:2014 | 06 | 2014 | Install occupancy sensors | $786 | $3,000 | |
| WM0060 #05 Y:2014 | 05 | 2014 | Repair and eliminate steam leaks | $1,080 | $110 | |
| WM0060 #04 Y:2014 | 04 | 2014 | Use insulation in furnaces to facilitate heating / cooling | $3,701 | $1,218 | |
| WM0060 #03 Y:2014 | 03 | 2014 | Lower temperature during the winter season and vice-versa | $5,355 | - | |
| WM0060 #02 Y:2014 | 02 | 2014 | Use or replace with energy efficient substitutes | $7,761 | $2,291 | |
| WM0060 #01 Y:2014 | 01 | 2014 | Replace boiler | $24,302 | $20,000 | |
| MZ0164 #08 Y:2014 | 08 | 2014 | Utilize higher efficiency lamps and/or ballasts | $56,600 | $384,000 | |
| MZ0164 #07 Y:2014 | 07 | 2014 | Eliminate or reduce compressed air usage | $47,302 | $25,000 | |
| MZ0164 #06 Y:2014 | 06 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,200 | $1,430 | |
| MZ0164 #05 Y:2014 | 05 | 2014 | Install compressor air intakes in coolest locations | $13,593 | $6,500 | |
| MZ0164 #04 Y:2014 | 04 | 2014 | Upgrade controls on compressors | $24,203 | $100,000 | |
| MZ0164 #03 Y:2014 | 03 | 2014 | Turn off equipment during breaks, reduce operating time | $71,454 | - | |
| MZ0164 #02 Y:2014 | 02 | 2014 | Insulate bare equipment | $1,744 | $1,500 | |
| MZ0164 #01 Y:2014 | 01 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $188,887 | - |