ITAC Assessment: MZ0169
ITAC logo
ITAC Assessment: MZ0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product machined parts for OEM
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 50,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,751 1,523,694
kWh
Electricity Demand $19,296 7,200
kW-mo/yr
Natural Gas $8,135 868
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,001 $600 $906
10,290
kWh
$95
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $209 $300 $189
2,152
kWh
$20
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $154 - - - $154
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,080 $7,000 $1,883
21,403
kWh
$197
-
kW-mo/yr
-
05 4.512: Condense operation into one building $1,574 - $1,425
16,188
kWh
$149
-
kW-mo/yr
-
TOTAL RECOMMENDED $5,018 $7,900 $4,403
50,033
kWh
$461
-
kW-mo/yr
$154
-
MMBtu
TOTAL IMPLEMENTED $4,809 $7,600 $4,214
47,881
kWh
$441
-
kW-mo/yr
$154
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs