Assessment Year | 2015 |
---|---|
Principal Product | machined parts for OEM |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
50,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 3,500
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,751 | 1,523,694 |
kWh
|
$0.088 |
Electricity Demand | $19,296 | 7,200 |
kW-mo/yr
|
$2.68 |
Natural Gas | $8,135 | 868 |
MMBtu
|
$9.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,809 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,001 | $600 |
$906
10,290
kWh
|
$95
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $209 | $300 |
$189
2,152
kWh
|
$20
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $154 | - | - | - |
$154
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,080 | $7,000 |
$1,883
21,403
kWh
|
$197
-
kW-mo/yr
|
- | |
05 | 4.512: Condense operation into one building | $1,574 | - |
$1,425
16,188
kWh
|
$149
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $5,018 | $7,900 |
$4,403
50,033
kWh
|
$461
-
kW-mo/yr
|
$154
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,809 | $7,600 |
$4,214
47,881
kWh
|
$441
-
kW-mo/yr
|
$154
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs