| Assessment Year | 2014 |
|---|---|
| Principal Product | shelving, closets |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
| Sales Range | $100 M to 500M |
| # of Employees | 550 |
| Plant Area |
708,300
ft2
|
| Annual Production | 9,000,000
pieces
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $541,002 | 12,622,200 |
kWh
|
$0.043 |
| Electricity Demand | $672,180 | 43,102 |
kW-mo/yr
|
$15.60 |
| Natural Gas | $362,016 | 90,504 |
MMBtu
|
$4.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $408,983 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $407,239 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $188,887 | - | - |
$188,887
-
kW-mo/yr
|
- | |
| 02 | 2.2511: Insulate bare equipment | $1,744 | $1,500 | - | - |
$1,744
-
MMBtu
|
|
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $71,454 | - |
$71,454
1,665,600
kWh
|
- | - | |
| 04 | 2.4224: Upgrade controls on compressors | $24,203 | $100,000 |
$24,203
564,172
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $13,593 | $6,500 |
$7,121
166,002
kWh
|
$6,472
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,200 | $1,430 |
$2,724
63,496
kWh
|
$2,476
-
kW-mo/yr
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $47,302 | $25,000 |
$24,783
577,689
kWh
|
$22,519
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $56,600 | $384,000 |
$29,652
691,200
kWh
|
$26,948
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $408,983 | $518,430 |
$159,937
3,728,159
kWh
|
$247,302
-
kW-mo/yr
|
$1,744
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $407,239 | $516,930 |
$159,937
3,728,159
kWh
|
$247,302
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs