Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

522

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0421 #01 Y:2016 Utilize controls to operate equipment only when needed $31 -
SD0536 #11 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,278 $1,200
SD0536 #10 Y:2016 Install occupancy sensors $1,296 $3,200
SD0536 #09 Y:2016 Reduce the pressure of compressed air to the minimum required $1,472 $200
SD0536 #08 Y:2016 Insulate bare equipment $1,796 $2,742
SD0536 #07 Y:2016 Use photocell controls $2,367 $3,700
SD0536 #06 Y:2016 Utilize energy-efficient belts and other improved mechanisms $2,995 $648
SD0536 #05 Y:2016 Use waste heat from hot flue gases to preheat $5,594 $11,180
SD0536 #04 Y:2016 Utilize daylight whenever possible in lieu of artificial light $6,259 $11,760
SD0536 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $7,468 $8,787
SD0536 #02 Y:2016 Modify process to reduce material use/cost $23,163 $68,259
SD0536 #01 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $91,093 $350,298
UD0949 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $6,996 $57,770
UD0949 #06 Y:2016 Eliminate or reduce compressed air usage $66 $500
UD0949 #05 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $807 $1,000
UD0949 #04 Y:2016 Optimize plant power factor $9,976 $4,120
UD0949 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $1,691 $2,800
UD0949 #02 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $1,698 $2,125
UD0949 #01 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $36,312 $5,400
IP0063 #11 Y:2016 Utilize energy-efficient belts and other improved mechanisms $1,006 $2,156