ITAC Assessment: SU0421
ITAC logo
ITAC Assessment: SU0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Springs
NAICS 332613: Spring Manufacturing
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 32,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,407 1,030,836
kWh
Electricity Demand $37,231 2,959
kW-mo/yr
Electricity Fees $3,426 -
Natural Gas $9,812 1,721
MMBtu
TOTAL YEARLY COSTS $117,876
RECOMMENDED SAVINGS* $5,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $31 - $31
497
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $554 $340 $239
3,679
kWh
$63
-
kW-mo/yr
$230 $22
03 2.7142: Utilize higher efficiency lamps and/or ballasts $73 $74 $49
748
kWh
$24
-
kW-mo/yr
- -
04 3.1161: Eliminate/reduce an operation $3,431 $3,650 $(-21.0)
(-320)
kWh
$(-145.0)
-
kW-mo/yr
$1,917 $1,680
05 2.6211: Conserve energy by efficient use of vending machines $123 $427 $123
1,893
kWh
- - -
06 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $848 $3,260 $848
13,051
kWh
- - -
07 2.7135: Install occupancy sensors $59 $290 $59
915
kWh
- - -
TOTAL RECOMMENDED $5,119 $8,041 $1,328
20,463
kWh
$(-58.0)
-
kW-mo/yr
$2,147 $1,702
TOTAL IMPLEMENTED $4,996 $7,614 $1,205
18,570
kWh
$(-58.0)
-
kW-mo/yr
$2,147 $1,702
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs