Assessment Year | 2007 |
---|---|
Principal Product | Knitting Yarns |
NAICS | 313110: Fiber, Yarn, and Thread Mills |
SIC | 2281: Yarn Spinning Mills |
Sales Range | $50 M to 100M |
# of Employees | 370 |
Plant Area |
458,425
ft2
|
Annual Production | 51,000,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,472,003 | 21,316,098 |
kWh
|
$0.069 |
Natural Gas | $1,615,234 | 191,562 |
MMBtu
|
$8.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $758,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $323,139 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $19,992 | $28,800 | - |
$19,992
-
MMBtu
|
- | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $35,650 | $40,000 | - |
$35,650
-
MMBtu
|
- | |
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $71,952 | $14,867 | - |
$71,952
-
MMBtu
|
- | |
04 | 2.1241: Reduce excessive boiler blowdown | $44,955 | $10,000 | - |
$40,770
-
MMBtu
|
$4,185
-
Tgal
|
|
05 | 2.4314: Use synthetic lubricant | $3,098 | - |
$3,098
69,293
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,808 | $5,132 |
$2,808
62,812
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $12,291 | $28,172 |
$12,291
274,965
kWh
|
- | - | |
08 | 2.5111: Convert from indirect to direct fired systems | $65,444 | $81,971 | - |
$65,444
-
MMBtu
|
- | |
09 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $323,139 | $174,963 | - |
$323,139
-
MMBtu
|
- | |
10 | 2.2511: Insulate bare equipment | $10,329 | $19,630 | - |
$10,329
-
MMBtu
|
- | |
11 | 2.2121: Increase amount of condensate returned | $26,394 | $20,000 | - |
$20,709
-
MMBtu
|
$5,685
-
Tgal
|
|
12 | 2.2121: Increase amount of condensate returned | $136,209 | $66,970 | - |
$136,209
-
MMBtu
|
- | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,869 | $5,000 |
$4,869
108,916
kWh
|
- | - | |
14 | 2.7135: Install occupancy sensors | $1,245 | $560 |
$1,245
27,848
kWh
|
- | - | |
TOTAL RECOMMENDED | $758,375 | $496,065 |
$24,311
543,834
kWh
|
$724,194
-
MMBtu
|
$9,870
-
Tgal
|
||
TOTAL IMPLEMENTED | $323,139 | $174,963 | - |
$323,139
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs