ITAC Assessment: UD0949
ITAC logo
ITAC Assessment: UD0949
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Welded Wire Mesh Concrete Reinforcement
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 133,100
ft2
Annual Production 66,526
ton
Production Hrs. Annual 7,920
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,691 7,246,800
kWh
Electricity Demand $150,244 16,908
kW-mo/yr
Electricity Fees $10,341 -
Natural Gas $26,202 3,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,312 $5,400 $29,602
495,923
kWh
$6,710
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,698 $2,125 $1,384
23,186
kWh
$314
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,691 $2,800 $1,449
24,270
kWh
$242
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $9,976 $4,120 - - $9,976 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $807 $1,000 $658
11,019
kWh
$149
-
kW-mo/yr
- -
06 2.4239: Eliminate or reduce compressed air usage $66 $500 $53
896
kWh
$13
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,996 $57,770 $4,537
76,003
kWh
$2,238
-
kW-mo/yr
- $221
TOTAL RECOMMENDED $57,546 $73,715 $37,683
631,297
kWh
$9,666
-
kW-mo/yr
$9,976 $221
TOTAL IMPLEMENTED $44,115 $64,170 $34,797
582,945
kWh
$9,097
-
kW-mo/yr
- $221
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs